SE Expansion Update

There’s so much good news on our SE building construction!

  • 96% complete on overall construction.
  • Parking aisle pavers are being installed.
  • Dental equipment has been delivered and is now being installed.
  • Marble tile has been installed on the main floor lobby walls and is being installed on the 2nd and 3rd floor lobby walls.
  • Pavers are being installed in the rooftop vestibule area.
  • A wood ceiling is being installed in the main lobby.
  • PEPCO power is in place and up and running.
  • Washington Gas service is up and running.
  • Water and sewer line connections are complete.
  • The elevator is operational.

Keep your eyes open … Virtual tours are coming soon!